TDLR-licensed contractors for panel work, repairs and installs — a 200-amp panel upgrade in a Houston home runs $1,090–$1,470 installed in the worked example below, and three smaller jobs are priced from named parts in the cost box.

A breaker that trips every evening, a panel with no spare space for the circuit you need, an outlet that has quietly stopped working — electricians in Houston, TX cover that work in homes across the city. This page prices the four jobs we can build from checked sources, walks through the permit the city requires for panel work, explains why Houston will not issue an electrical permit to a homeowner, and teaches the two-part licence check. It also covers the one job we decline to put a total on: the EV charger install.

How much does an electrician cost in Houston?

Electricians in Houston, TX charge by the job, and four common jobs can be priced here from named parts, published wage data and the city's own fee schedule: the panel upgrade that anchors this page, a surge protector fitted at the panel, a ceiling fan swapped onto an existing rated box, and a single GFCI outlet replacement.

JobInstalled cost
200-amp panel upgrade or replacement, including meter loop and service work$1,090–$1,470
Whole-home surge protector, installed at the panel$270–$320 — the device is priced at manufacturer list; see the note under the worked example
Ceiling fan replacement, on an existing fan-rated box$210–$305
GFCI receptacle replacement, one outlet on existing wiring$85–$130

Those are the only ranges on this page, because they are the only ones built that way. A diagnostic or service-call fee carries no figure, because no official source publishes one and TDLR does not regulate prices. Job-by-job reasoning for the whole state sits in the Texas electrician cost guide.

  • Free quotes
  • No obligation
  • Licensed professionals
  • Texas-focused
Electrician working at an open residential breaker panel

Electrical emergency in Houston: make it safe first

Electrical emergencies in a home are safety events before they are repair jobs. Work through these steps first, then call.

  • Sparks, crackling or a buzzing outlet or switch: stop using that circuit. Switch its breaker off at the panel and leave the outlet alone until it has been checked.
  • A burning smell near the panel or an outlet: switch off the affected circuit — the main breaker if you cannot tell which circuit it is — and do not open the panel or investigate inside it. Call a licensed electrician.
  • The whole home has lost power: check your main breaker once. If it has not tripped and neighbouring homes are dark too, the outage is wider than your house; wait for power to return. If yours is the only dark home and the breaker looks fine, the fault may sit in your own service equipment — that is licensed work, not a DIY inspection.
  • A breaker that trips again right after a reset: do not keep resetting it. A breaker that will not stay on is reporting a fault on that circuit; leave it off and get the circuit checked.

Calling an electrician out at night or on a weekend usually costs more than booking the same job in normal hours, because unsocial hours cost a company more to staff. We publish no call-out fee or after-hours premium, because none could be verified from primary sources, so ask for the call-out charge before you agree to the visit. Nothing here promises that any given company will answer at any given hour.

What an electrician's visit covers — and what is included

Diagnosis and repairs

A repair visit starts with finding the fault: testing the circuit, the device and the breaker in an order that separates a failed part from a wiring problem. The small rows in the cost box show the honest shape of a repair — one named part, a stated slice of labour, and any call-out fee sitting outside the figure because no publishable basis for one exists.

Panel and service work

The panel upgrade below is the full version of this job: the old load centre out, the new one set in the same location, existing branch circuits transferred and re-terminated, the meter loop and service work the job includes, labelling, and the city inspection. What a given quote includes beyond that — extra breakers, a new meter base, mast work — is exactly where quotes diverge, and the exclusions under the example name the lines to compare.

Small installs on existing wiring

The fan, GFCI and surge protector rows are all like-for-like work on what is already there: a fan onto a box already rated for one, a device into an existing box on existing wiring, a protector into a panel with a spare breaker position. A fitting where no wiring or no rated box exists is different work, and it is not priced on this page.

Worked example: a 200-amp panel upgrade, priced step by step

The job, with its assumptions stated: replacement of the existing panel with a 200-amp service in a single-family Houston home, new panel in the same location, including meter loop and service work up to 50 kW. The permit is pulled by a TDLR-licensed electrical contractor registered with the City of Houston, and the city inspects the work. Equipment: a Square D Homeline 200-amp, 40-space, 80-circuit load centre, sold as a value pack (model HOM4080M200PCVP).

LineAmountBasis
Panel (value pack)$269.00Lowe's retail price, seen November 17, 2026 — retail prices change
Permit$136.95City of Houston 2026 fee schedule: $94.00 meter loop and service (up to 50 kW) + $9.39 panel with eight or more circuits + $33.56 administration fee. A plan-review fee is excluded — the city may assess one, and no computable electrical amount appears in the schedule
Labour$709.20–$1,063.808–12 hours (stated assumption: disconnect and coordinate the service changeover, remove the old panel, set the new load centre, transfer and re-terminate the existing circuits, label, attend inspection) at $88.65 an hour — see the assumption below
Total$1,090–$1,470Rounded from the two computations below

The labour rate carries its assumption in the open. The U.S. Bureau of Labor Statistics puts the mean wage for electricians in the Houston metro at $29.55 an hour (OEWS, May 2025). A wage is only the employer's pay cost; it carries none of the payroll taxes, insurance, vehicle, overhead and margin a business must recover before it can sell an hour. We build the rate as $29.55 × 3.0 = $88.65 an hour. That multiplier is our stated assumption, not a market quote — no verified Houston billable rate exists, and this page never presents $88.65 as one.

Computed a second way, the total holds. Method 2 uses the Texas mean electrician wage — $28.50 an hour, a mean, read from BLS itself (OEWS, May 2025) — times the same 3.0 assumption, giving $85.50 an hour and totals of $1,089.95–$1,431.95. The two methods' midpoints sit about 2.5% apart, and the rounded overlap is the published $1,090–$1,470.

The value pack includes the 200-amp main breaker and five branch breakers, per the manufacturer's datasheet for this model. The surge protector row in the cost box is built on the Square D HEPD80 at its manufacturer list price of $185.00 (Schneider Electric USA, seen November 17, 2026) plus 1–1.5 hours of labour — a list price is not a street price, and a retailer may charge less.

Not in this total: branch breakers beyond the five in the value pack (we hold no verified retail price for them), AFCI or GFCI breaker upgrades if the inspector requires them, meter base replacement, service mast or underground lateral work beyond the meter-loop scope, any CenterPoint Energy fee (none was verified), drywall or paint repair, a whole-home surge protector (priced separately in the cost box), and any plan-review fee.

Permits and inspections in Houston

Houston requires an electrical permit for panel and service work. Under the Houston Electrical Code (§301.1) it is unlawful to install, alter or replace premises wiring or regulated equipment without an active permit, and the work must be inspected — wiring may not be connected to the energy source until the city has inspected and authorised it. The one nearby exemption (§301.2(6)) covers swapping a single breaker for another of the same capacity in the same location. It does not stretch to a panel.

Only a licensed, registered contractor can pull the permit. Section 302.1 is direct: only a licensed and registered electrical contractor shall obtain an electrical permit, and the application is signed by the company's master electrician of record, who must also be registered with the city. The business registers both of its TDLR licences — master and contractor — with the city's Electrical Inspections section (Form CE-1189); the registration runs one year, and the permit itself is valid for 180 days.

That rule has a consequence worth stating plainly: Houston has no homeowner electrical permit. The Permitting Center publishes a homeowner's plumbing permit and a homeowner mechanical application — but no homeowner electrical application exists, and the only electrical application requires a master electrician's signature. The state exemption for work in a home you own and live in does not create a DIY permit path here. Panel work in Houston goes through a licensed contractor, full stop.

The fee on this page's example is computed, not estimated: $94.00 for the meter loop and service (up to 50 kW), plus $9.39 for a panel with eight or more circuits, plus the $33.56 administration fee — $136.95. A panel-only job, with no meter loop or service work, prices differently: the $9.39 panel fee falls under the schedule's $91.06 minimum, so the permit is $124.62. One exclusion travels with both figures: the city may assess a plan-review fee on a valuation basis, and the schedule gives no computable electrical amount for it, so it is excluded here and disclosed rather than guessed.

Two more Houston facts complete the picture. The city works to the 2023 National Electrical Code, adopted by ordinance effective January 1, 2024 — the last completed city adoption we could verify. Texas has since moved on: the state adopted the 2026 NEC effective September 1, 2026, and Houston put proposed 2026 provisions out for public comment in August 2026, but no completed Houston adoption had been published when we checked. And before CenterPoint Energy will release service to a home, the city requires the electrical permit and a passing inspection (Form CE-1416) — we state no CenterPoint fee or timeline, because none was verified.

Choosing electricians in Houston, TX: the two-part licence check

Houston adds a city registration on top of the state licence, but the licence itself is Texas's, issued by TDLR and valid statewide. Checking it takes two searches, because the record that names a company's master never prints that master's own status:

  1. 1

    Get the company's licence number — from the truck, the quote or the invoice. On paper it carries the TECL prefix; in TDLR License Search the number appears without it.

  2. 2

    Open the company's record, titled Electrical Contractor (Type: EC). Check that the name, address and county are the company you are dealing with, that the status is Active, and that the expiration date has not passed.

  3. 3

    Read the "Master:" line on that record. It names the Master Electrician of Record, with his licence number and expiration.

  4. 4

    Search again for that master, by name or by the number from step 3, and open his record, titled Master Electrician (Type: ME). Name and number must match the contractor record; his status must be Active and unexpired.

  5. 5

    If either record fails — expired, missing, or the names do not line up — the company is not currently legal to hire for electrical work, whatever its truck says.

  6. 6

    One more check, if you want it: TDLR's final-orders search lists enforcement actions against licensees.

Behind the check sit two requirements worth knowing. Every Electrical Contractor must be, or employ, its master of record — a master can be assigned to only one contractor at a time unless he owns more than half of the business — and the contractor must carry commercial general liability insurance of at least $300,000 per occurrence, $600,000 aggregate and $300,000 for products and completed operations, kept in force at all times. Ask for the certificate, get the quote in writing with its exclusions named, and keep the final payment until the inspection passes.

EV chargers in Houston: what we can price, and what we cannot

The charger itself is easy to price. Two named units, seen November 17, 2026: the ChargePoint Home Flex Level 2 charger at $599.00 (Home Depot) and the Tesla Wall Connector at $635.00 (Tesla's own store). Houston's fee schedule also prices the permit line for the outlet: an Electrical Vehicle Charging Outlet, Level 2, is $100.71, before the schedule's administration fee and minimum structure.

An installed total is a different matter, and this page does not publish one, because we could not verify one from primary sources. The dominant cost is the circuit run between your panel and the charger, and its length is set by your home: a panel on the garage wall and a panel across the house are different jobs. We also hold no verified retail price for the cable or the two-pole breaker the circuit needs, and if your panel has no spare capacity, the panel upgrade above becomes part of the job. Rather than invent a range, ask any quoting company three things: what run length the quote assumes, whether the breaker and permit are in it, and whether your panel's capacity was actually checked.

What changes the cost in Houston

Whether service work is part of the job

The worked example includes the meter loop and service work, which is why its permit is $136.95. A panel swap with no service work carries the $124.62 permit instead and fewer hours. Two quotes for "a panel job" can be pricing genuinely different scopes — this is the first line to compare.

Breakers beyond the box

The value pack covers a main breaker and five branch breakers. A panel with more circuits to land, or AFCI/GFCI breaker upgrades the inspector requires under the city's adopted 2023 NEC, adds parts this page could not price from a retailer — expect them as a separate line on a real quote, and ask for it to be itemised.

Panel location and access

The example keeps the panel in the same location, on existing circuits of workable length. Moving a panel, or service equipment that turns out to need mast or meter base work, takes the job outside the example's scope and its total.

Timing: nights, weekends and storm weeks

Planned work is priced from ordinary hours. The same fault-finding at night or on a weekend usually costs more, set by each company with no published rate we can verify. Get the call-out basis stated before the visit, not after it.

Houston electrician questions

How much does a 200-amp panel upgrade cost in Houston?

$1,090–$1,470 installed in our worked example: a Square D Homeline value pack at $269.00 retail, the city's permit at $136.95, and 8–12 hours of labour built from BLS wage data under a stated 3.0-times assumption, cross-checked on a second wage basis. Excluded lines — extra breakers, meter base work, any plan-review fee — are printed with the example, and a quote that includes them will run higher.

Do I need a permit to replace my electrical panel in Houston?

Yes. Panel and service work needs an electrical permit under the Houston Electrical Code, and the wiring cannot be connected to the energy source until the city has inspected and authorised it. The only nearby exemption is swapping one breaker for another of the same capacity in the same place — that does not cover a panel.

Can I pull my own electrical permit in Houston?

No. Under §302.1 of the Houston Electrical Code, only a licensed and registered electrical contractor may obtain an electrical permit, signed by its master electrician of record. The Permitting Center offers homeowner permits for plumbing and mechanical work, but no homeowner electrical permit exists. The state rule that lets an owner-occupier do electrical work in their own dwelling does not override the city's permit rule.

How do I check an electrician's licence in Houston?

The licence is a Texas licence, checked on TDLR License Search in two parts. Open the company's Electrical Contractor record (Type: EC) — Active, unexpired — and read its "Master:" line for the Master Electrician of Record. Then open that master's own Master Electrician record (Type: ME) and confirm the name and number match and his status is Active too. Houston's separate requirement is city registration, which the permit itself proves: an unregistered contractor cannot pull one.

How much does it cost to install an EV charger in Houston?

We publish the parts we can verify and not a total. Charger units: $599.00 for a ChargePoint Home Flex, $635.00 for a Tesla Wall Connector. The city's permit line for a Level 2 charging outlet is $100.71. The installed figure turns on the cable run from your panel to the charger, which is different in every home, and we hold no verified prices for the cable or breaker — so any single range we printed would be invented.

What does it cost to replace a GFCI outlet in Houston?

$85–$130 for one outlet on existing wiring, built from a Square D X Series GFCI receptacle at $41.84 retail plus half an hour to an hour of labour. The row is priced as professional work for a legal reason: anyone hired to do electrical work in a Texas home must be licensed and working through a licensed contractor. The owner-occupier exemption covers only work you do yourself, in a home you own and live in.

Do Houston electricians charge a service-call or diagnostic fee?

Many do, but no figure appears here. No official source publishes a Houston diagnostic fee, and TDLR licenses electricians without regulating what they charge. Ask two questions before booking: what the visit costs, and whether the fee is credited toward the repair if you proceed. Get both answers before anyone is dispatched.

Which electrical code does Houston use?

The 2023 National Electrical Code, with Houston amendments, effective in the city from January 1, 2024 — the last completed Houston adoption we could verify. Texas adopted the 2026 NEC statewide effective September 1, 2026, and Houston had proposed 2026 provisions out for public comment in August 2026, but the city's adopted provisions still read 2023. Work on your home is inspected against that edition — one reason an inspector can require breaker upgrades that an older panel predates.

Areas served in and around Houston

Tell us your neighbourhood when you request a quote, and we will match you with a professional who covers your part of the city.

When it lands, the list will describe the area this page serves for matching homeowners with professionals. It is this page's coverage statement — it says nothing about where any individual company will or will not travel.

Related services and other Texas cities

Disclaimer. The costs on this page are estimates only, computed from the sources below with their assumptions printed next to them. Your final price depends on your home, the job and the scope you agree, and costs vary by job, material and location. Always confirm a contractor's licence and insurance before work starts.

Sources

  • Texas Department of Licensing and Regulation — electrician licensing: contractor licence, Master Electrician of Record, insurance minimums, License Search and final-orders search; 2026 NEC adoption, 16 TAC §73.100, effective September 1, 2026 (tdlr.texas.gov)
  • Texas Legislature — Occupations Code Chapter 1305, including §1305.151, §1305.201 and §1305.003(a)(6)
  • City of Houston, Houston Permitting Center — Houston Electrical Code, Administrative Code Provisions for the 2023 NEC (§§301.1, 301.2, 302.1); 2026 Permit Fee Schedule, electrical section; Form CE-1416, electric service release; 2026 NEC proposed administrative provisions, public-comment notice, August 2026 (houstonpermittingcenter.org)
  • U.S. Bureau of Labor Statistics, OEWS May 2025 — electrician wages: Houston metro mean and Texas mean, both read from BLS (bls.gov)
  • Lowe's — Square D Homeline 200-amp load centre value pack, $269.00; Hunter Toledo 52-in ceiling fan, $126.00; Square D X Series GFCI receptacle, $41.84 — retail prices seen November 17, 2026
  • Schneider Electric USA — Square D HEPD80 surge protective device, manufacturer list price $185.00, seen November 17, 2026
  • The Home Depot — ChargePoint Home Flex Level 2 EV charger, $599.00, seen November 17, 2026; Tesla Shop — Wall Connector, $635.00, seen November 17, 2026
Call for a free quote Get a Quote